Building Information Modeling (BIM)
- Engineering
- 14 Full-Time Licensed Engineers
- 44+ LEED-Accredited Professionals
- Internal Quality Control – Technical Review
- Resource to Entire Project Team
- Coordination
- 26 AutoCAD Stations
- CADMECH/Quickpen 3-D Pipe Designer (3-D piping/plumbing)
- CADDUCT (3-D sheet metal)
- NavisWorks (3-D visualization software, collision checking)
- Detailed Shop Drawings by Trade
- Prefab for Shop
- Planning/Installation Drawings for Field
- Total Station
- TDIndustries-Led BIM Process
- Mechanical Contractor’s Systems Take the Most Space
- (ductwork, piping, plumbing, medical gas)
- Determine Ground Rules
- Participation by All Trades (electrician, fire protection, structural)
- Scope: What is included in the model?
- Common 0,0,0 Point
- Files Uploaded to FTP Site
- General Contractor Enforced
- Engineer of Record Present at Final Fly-Through
- Model Delivered to the Owner at the End of Project for Operations
Clash Detection
- Clash Detection
- Automated Conflict Resolution
- Documentation of Resolution
Fly-Through
Ductwork Serving Lobby 1.600.2 up from Level 1, Area "A"