Case Studies

Skip Navigation Links.
Texas Womans University

Texas Woman's University

Dallas, TX

Central Plant Optimization– Texas Woman’s University was concerned that the CUP was operating in a sub-optimized mode.

utiliVisor Solution:
TDIndustries’ proposed to implement its utiliVisor® system for a central Plant Optimization for a total cost of $75,000 with a one-month installation period. TD projected an annual energy savings to TWU of $96,000.

Results to Date:
• Energy consumption has been reduced $16,000 during the coldest three months of the plant’s operating season
• The online Energy Dashboard shows ‘real time’ impact on costs and provides 24/7 monitoring
• TWU and TD have identified several potential changes / retrofits to improve operations

 

Download PDF