First Solar

Offering:
Industries:
Locations:

TDIndustries provided mechanical and plumbing services for this 1,000,000 sf module manufacturing facility with Arizona’s largest solar rooftop. Also included was an additional 300,000 sf office space for this solar energy provider. TD installed four 2,500-ton chillers, two 575-ton chillers, five cooling towers, twelve air handling units and eight makeup air units. Piping consisted of 34,000 lf of carbon steel pipe, 23,000 lf of hydronic pipe and 285,000 pounds of ductwork.

An aggressive schedule with evolving project design made it imperative that the TD team remained focused and flexible, communicating with the owner and design team every step of the way. The use of TD’s prefabrication shop for all of the HVAC piping systems helped keep the project on schedule and on budget.