    Project Overview:

    arrow icon
    This large controls project is an extensive modernization of a high-rise, bringing together TDIndustries’ Controls and Facilities Services teams to provide one coordinated solution. The scope includes a full building automation system upgrade, HVAC engineering, replacement of chillers, pumps and cooling tower equipment, and upgrades to piping, domestic water systems, fire protection equipment and controls. The customer values having one company that can coordinate the expertise needed to get the job done.

    Market

    arrow icon
    • Commercial/Office

    Location

    arrow icon
    Confidential

    Services Provided

    arrow icon
    • Controls
    • Facilities
    • Engineering

    Project Size

    arrow icon
    52-story high-rise with nearly 2,000 terminal units

    Project Complexity

    arrow icon
    Limited original building documentation requires TDIndustries to field-verify existing systems and deliver updated as-built drawings as work progresses. Engineering, software and field teams are working in parallel on upgrades to building automation, HVAC, plumbing, domestic water and fire protection systems. As field teams install equipment, software teams build the corresponding digital environment so the software is ready as each system comes online. This collaborative approach brings multiple disciplines together to solve challenges in real time while delivering a smarter, more connected building for the customer.