Skip to content

For Immediate Service:

800-864-7717

    Houston Space Coast Construction Project

    See All Projects
    project image 1

    project image 2

    project image 3

    Project Overview:

    arrow icon
    This project features complex mechanical and plumbing systems designed to support a highly technical research and innovation facility. TDIndustries’ scope included HVAC and plumbing construction services, including extensive ducting systems, hydronic piping and equipment installation. The project features 22 air handlers and supply and return ductwork throughout the facility.

    Market

    arrow icon
    • Higher Education

    Location

    arrow icon
    Confidential

    Services Provided

    arrow icon
    • Construction

    Project Size

    arrow icon
    22 air handlers, 146 hot-water terminal units and supply and return ductwork serving expansive open areas.

    Project Complexity

    arrow icon
    The scale and height of the facility created unique installation challenges, particularly for large return-air ductwork installed approximately 80 to 90 feet above the floor. Trained crews used 125-foot articulating boom lifts to install large sections of prefabricated ductwork, while piping was also prefabricated to support efficient field installation. The project required system testing and preparation, including medium-pressure duct testing and flushing of the chilled- and hot-water piping systems. Close coordination between prefabrication and field teams supported installation, testing and logistical requirements.